top of page

Notable Projects

6ab229_8f6369342e9b44edae293412a2b0d4f3_mv2.webp

Kansas Solar Substation

Project: 28MW 115KV/34.5KV Solar Substation and 115KV Transmission Line
Scope of Work: Engineering, Procurement, Construction, Commissioning, and Startup
Customer: Confidential Client

Location: Johnson City, KS

Interconnect Utility: SunFlower Electric
Year: 2019-2020

APG provided engineering, procurement, construction, commissioning, and startup services for this solar substation and T Line project. Engineering started under an LNTP in August and an NTP/PO was issued in October 2019 and the required energization date was March 06, 2020. The schedule, as stated, was very extremely tight and required that PO’s be placed expeditiously and had to be expedited with almost no room for error. The transformer was supplied by the owner and the installation sequencing had to be flawless to ensure on-time energization.

There were LDs on the project as well but working together with our suppliers, owner, and our installation and testing teams we were able to achieve the energization on the contracted energization date of 03/06/20.

Interconnect utility for the project was SunFlower and detailed coordination and reviews on protection schemes including primary and backup protection systems were done with them that resulted and a system that worked right the first time. Detailed step by step energization procedure was developed with signoffs whose implementation resulted in a safe and coordinated and on time energization of the project.

6ab229_058da580f72d41e2a80b257fa9e2d929_mv2.webp

Carbondale Solar Plant

Project: 0.92MW Solar Plant & 12.47KV Interconnect 
Scope of Work: Engineering, Procurement, Construction, Commissioning, and Startup
Customer: Confidential Client

Location: Carterville, IL

Interconnect Utility: Ameren
Year: 2019-2020

The project consisted of installing and driving the piles, installing the racking system with single-axis trackers, installing the solar panels. Cable management included the Shoals BLA system. The electrical system included CPS inverters, Also energy Solar management and control system, installation of 480V distribution panelboard with integral surge suppression, a 12.47/ 480V step-up transformer, and a pole-mounted GOAB and a 12.47KV interconnect to the Ameren distribution system. APG provided full and complete engineering, procure, and construct services on this project including the needed commissioning and startup services on this project.

6ab229_066e0159ffa046d582438b8393849609_mv2.webp

West Columbia BESS

Project: 10MW/10MWHR BESS with 12.47KV Connection to Utility
Scope of Work: Owner’s Engineer
Customer: Confidential Client

Location: West Columbia, TX

Interconnect Utility: Texas-New Mexico Power
Year: 2019-2020

Prospect Storage 10MW/MWh utility-scale, distribution-connected standalone battery storage project located in West Columbia Texas. APG was involved from the start of the project and assisted in developing concept designs and reviewing detailed project designs, assisted in the selection of Battery Chemistry, Battery and Inverter suppliers, and the EPC contractor. Work also included providing ongoing project reviews through detailed design and construction as well as assistance in commissioning, startup, and energization of the project.

6ab229_2cc2c511309b480f87683f000407948c_mv2.webp

San Antonio Solar Carport

Project: Solar Car Port and Class II Car Charger Installation
Scope of Work: Engineering
Customer: Confidential Client

Location: San Antonio, TX

Interconnect Utility: CPS Energy
Year: 2019-2020

APG provided engineering services for this carport and car charger installation program in the City of San Antonio consisting of a total of 10 installations totaling about 4.8MWAC.
Scope of work included the installation of carport structures and associated solar panel install and installation of Class II car Chargers.
The scope also included the installation of utility interconnect transformer, utility metering, all interconnect wiring and the Main Power panel, lighting panels, and associated installation racks. The project also included canopy lighting and a power monitoring system. Equipment suppliers included Mission Solar Panels, SMA Inverters, and Also Energy SCADA system.

Johnson Corner Solar Time-Lapse