Our Work
With foundational background and strong leadership, the team has grown by adding experts
in renewable, energy storage, microgrids, EV charging, and substation design. All APG team
members have extensive knowledge in Utility interconnect and operations, which uniquely qualifies our organization to be your partner for projects.
01 |
2MW SOLAR CAR PORT & CLASS II CAR CHARGER INSTALLATION
APG handled the full spectrum of services – engineering, procurement, construction, commissioning, and startup – for a 2MW AC carport solar project at a major Orlando manufacturer.
The work included setting up the carport canopy structure, installing solar panels, a utility interconnect transformer, main switchboard, AC collection system, and interconnect wiring. All aspects of the installation met rigorous industry standards and codes.
02 |
600KW Solar Car Port Canopy, EV Chargers & BESS Microgrid
APG managed a comprehensive microgrid project, involving:
-
Solar carports
-
EV chargers
-
500KW Battery Energy Storage System
The project encompassed:
-
About 600KW AC and 500KW battery storage across 2 installations
-
Carport structure set up with solar panels
-
Installation of 12 Level II and 4 Level Class III EV Chargers
-
Replacing solar modules
-
Installing a utility interconnect transformer and metering
-
Interconnect wiring and NEMA 3R Main switchgear panel
-
Lighting panels and racks
-
Canopy lighting and power monitoring system
Key suppliers:
-
First Solar Panels
-
SMA Inverters
-
Also Energy SCADA system
03 |
0.973MW Solar Array
APG handled engineering, procurement, construction, commissioning, and startup for a 0.973MW grid-connected ground mount solar project in Carterville, Illinois. The scope included civil/electrical design, single-axis tracker racking installation, utility interconnect transformer setup, metering, interconnect wiring, and main power paneling. Ongoing project reviews were provided via management software. The project passed final testing and energization, meeting Ameren requirements on schedule.
04 |
28MW 115KV/34.5KV Solar Substation & 115KV Transmission Line
This is your Project description. Provide a brief summary to help visitors understand the context and background of your work. Click on "Edit Text" or double click on the text box to start.
05 |
2MW SOLAR CAR PORT & CLASS II CAR CHARGER INSTALLATION
APG handled the full spectrum of services – engineering, procurement, construction, commissioning, and startup – for a 2MW AC carport solar project at a major Orlando manufacturer.
The work included setting up the carport canopy structure, installing solar panels, a utility interconnect transformer, main switchboard, AC collection system, and interconnect wiring. All aspects of the installation met rigorous industry standards and codes.
06 |
Multiple Co-Lo Datacenter Applications
APG is the preferred EPC provider for 9 projects across Utah, Texas, Arizona, Virginia, and Colorado, comprising a total of 27 substations for co-location datacenter use, both temporary and permanent. APG's responsibilities encompassed designing and constructing transformers, high-side and load-side protection devices, as well as utility interconnect. APG held the role of engineer of record for these projects.
07 |
10MW/10MWHR BESS with 12.47KV Connection to Utility
APG served as the owner's engineer for the 10MW/MWh Prospect Storage utility-scale battery storage project in West Columbia, Texas. Engaged from project inception, APG aided in concept and detailed design development, supplier selection for Battery Chemistry, Battery and Inverter, as well as the EPC contractor. Ongoing project reviews spanned design and construction phases, with support through commissioning, startup, and energization.
08 |
Solar, Energy Storage
& Bitcoin Mining
APG is the selected EPC provider for both Phase 1 and Phase 2 of this project. Phase 1 comprises 85MVA, while Phase 2 comprises 227 MVA. APG's responsibilities encompass designing and constructing energy storage systems, transformers, high-side and load-side protection devices, as well as utility interconnect. APG served as the engineer of record for these projects.
09 |
10MW/10MWHR BESS with 12.47KV Connection to Utility
APG served as the owner's engineer for the 10MW/MWh Prospect Storage utility-scale battery storage project in West Columbia, Texas. Engaged from project inception, APG aided in concept and detailed design development, supplier selection for Battery Chemistry, Battery and Inverter, as well as the EPC contractor. Ongoing project reviews spanned design and construction phases, with support through commissioning, startup, and energization.
Contact Us